Confirmation.com - Probe | Respond to ROMM at assertion level (relevant assertions) and selected assertion for material COTABD
FAQ

Probe | Respond to ROMM at assertion level (relevant assertions) and selected assertion for material COTABD

Published:  30/07/2024
Process flow showing how to Respond to ROMM at assertion level (relevant assertions) and selected assertion for material COTABD for a group audit. This decision tree shows the flow of the audit process (including the documents to be completed) for determining the resources needed to perform risk assessment procedures in the separate group audit engagement

  Answer:

image.png
 
Rate this article: 
  (Popularity = 0/100, Rating = 0.0/5)

   Related Articles

Probe Audit | 10.50G - Plan extent of risk assessment procedures Probe What's New 2024.20.13 Audit International | Grouping Notice Probe | Plan risk assessment procedures related to COTABDs and resources to be used view all...


   Search Results

Sending a Future Dated Request Can I request for a future "As of Date"? Can I request more information from the Responder (Bank)? What does the Future Dated Confirmation Report provide? (New Version of Confirmation) Probe | How do I fix the error “knowledge library not found” when inserting a step in the work program? view all...



Didn't find what you were looking for?


Watch a video

Check out our helpful video guides

Contact Support

Contact our support team
Copyright © 2025 | All Rights Reserved