Scenario:

When you need to change the overall final materiality on the leadsheets.
 
image.png
 

  Answer:

Note:

  • Ensure that all the lead sheets are closed before making any changes to the evaluation of misstatements(02.40).

  • Changes made on other documents like 02.40 affect other scripts that need to be updated before you can open the leadsheets. 

 

  1. Open document 02.40 Evaluation of misstatements and override the ‘overall materiality set during the planning stage’ and click on ‘save’.


image.png
 

2. Open document 10.60 Overall materiality assessment, to refresh the changes made on document 02.40 (to update the scripts). 
 

image.png
 

3. Open the lead sheets, and note that the amount changed. 
 

image.png

 
 
 
 
Rate this article: 
  (Popularity = 0/100, Rating = 0.0/5)

   Related Articles

Probe MMX |Tips and Tricks Webinar 2 Help Protection Assertions Materiality Amounts not pulling through correctly to all Probe documents due to adjustments passed. Probe | Amounts not pulling through or pulling through incorrectly Probe | Do I use performance materiality or specific materiality in planning and performing the audit? view all...


   Search Results

Probe | I have installed the IFRS recognition and measurement template but the procedures do not change? When performing "File New from Existing" some of the info on the XBRL Mandatory page is incorrect, what is the cause? Audit International Latest Release Probe Audit | What is Probe Audit Premium+ ? Probe Audit | Important information on Probe MMX licensing (Probe Audit Premium+) view all...



Didn't find what you were looking for?


Watch a video

Check out our helpful video guides

Contact Support

Contact our support team
Copyright © 2025 | All Rights Reserved