Scenario:
When you need to change the overall final materiality on the leadsheets.
Answer:
Note:
-
Ensure that all the lead sheets are closed before making any changes to the evaluation of misstatements(02.40).
-
Changes made on other documents like 02.40 affect other scripts that need to be updated before you can open the leadsheets.
-
Open document 02.40 Evaluation of misstatements and override the ‘overall materiality set during the planning stage’ and click on ‘save’.

2. Open document 10.60 Overall materiality assessment, to refresh the changes made on document 02.40 (to update the scripts).

3. Open the lead sheets, and note that the amount changed.

Rate this article:
|vote=None|
Processing...
(Popularity = 0/100, Rating = 0.0/5)
Related Articles
Amounts not pulling through correctly to all Probe documents due to adjustments passed.
Caseware Working Papers | Introduction to Leadsheets
Caseware Time | How to Add a VAT amount on an Invoice?
ISAE Attestation | Latest release
view all...
Search Results
Caseware Working Papers | Locking down a file in Caseware Working Papers
Probe | Why do I get a warning about a demo period and my documents are locked when I open my documents?
Why is the confirmation locked to another clerk (New Version of Confirmation)
How do I lock or unlock accounts in the Working Trial Balance?
Probe | What is the cause of my Probe document being locked?
view all...