Scenario:
When you need to change the overall final materiality on the leadsheets.
 
 
                                    
                                    
                                          Answer:
                                    
Note:
- 
	Ensure that all the lead sheets are closed before making any changes to the evaluation of misstatements(02.40). 
- 
	Changes made on other documents like 02.40 affect other scripts that need to be updated before you can open the leadsheets.  
 
- 
	Open document 02.40 Evaluation of misstatements and override the ‘overall materiality set during the planning stage’ and click on ‘save’. 

 
2. Open document 10.60 Overall materiality assessment, to refresh the changes made on document 02.40 (to update the scripts). 
 

 
3. Open the lead sheets, and note that the amount changed. 
 

 
 
 
                                     
                                
                                
                                
                                
                                    Rate this article: 
|vote=None|
                Processing...
  
                                    (Popularity = 0/100, Rating = 0.0/5)
                                    
                                
                                       Related Articles
                                
                                
                                        
                                            Probe MMX |Tips and Tricks Webinar 2 Help Protection Assertions Materiality
                                        
                                        
                                        
                                            Amounts not pulling through correctly to all Probe documents due to adjustments passed.
                                        
                                        
                                        
                                            Probe | Amounts not pulling through or pulling through incorrectly
                                        
                                        
                                        
                                            Probe | Do I use performance materiality or specific materiality in planning and performing the audit?
                                        
                                        
                                view all...
                                
                                
                                
                                
                                       Search Results
                                
                                
                                        
                                            Guide ZA-Letter of Credit Form
                                        
                                        
                                        
                                            Confirmation Billing Guide (Effective 1 Nov 2024)
                                        
                                        
                                        
                                            Guide ZA-Signatories Form
                                        
                                        
                                        
                                            Guide ZA-Bills Form
                                        
                                        
                                        
                                            Guide ZA-Asset form
                                        
                                        
                                view all...