How does ISSA Sustainability work? 


  Instructions:

About ISSA Sustainability

ISSA Sustainability is a new cloud app on the Caseware Cloud platform, built on Caseware Smart Engagement. It supports practitioners performing sustainability assurance engagements under ISSA 5000, issued by the IAASB, and the International Ethics Standards for Sustainability Assurance (IESSA) in the IESBA Code.

ISSA 5000 is effective for assurance engagements on sustainability information reported for periods beginning on or after 15 December 2026, or as at a specific date on or after 15 December 2026. Many firms still perform this work on spreadsheets and adapted audit templates. ISSA Sustainability replaces these with a standardised, reviewable engagement file that follows the flow of a sustainability assurance engagement, rather than a repurposed financial statement audit.

Highlights of this release:

  • A purpose-built ISSA 5000 workflow from acceptance and continuance through to the assurance report.
  • A risk and control matrix (RACM) that links risks to controls and generates a work program for each sustainability matter.
  • A materiality form for double materiality - financial and impact - set per disclosure.
  • Support for limited, reasonable and combined assurance, with a dedicated assurance report for each.
  • Sustainability-specific documents for the entity's process to identify the information to be reported, materiality per disclosure, estimates and forward-looking information, group aggregation, and the work of experts, other practitioners and internal audit.
  • Ethics and independence confirmations aligned to the IESSA.
  • Built-in quality and oversight - sign-offs, a senior checklist, an engagement leader declaration and engagement quality review documents.

A jurisdiction-neutral core with an optional South Africa add-on.

Jurisdiction-neutral by design

The core engagement file is built on ISSA 5000 and the IESBA Code, including the IESSA. No jurisdiction's local requirements are assumed. Local content is delivered through an optional add-on, selected in 101. The add-on adds local content only - it does not change any core requirement, condition or wording in the file.
Where a jurisdiction has adopted, modified or added to these pronouncements, the practitioner remains responsible for identifying and complying with those requirements. Selecting an add-on does not discharge that responsibility.

Limited, reasonable and combined assurance

The level of assurance selected in 111 Engagement evaluation drives the conditional logic throughout the file. Procedures that apply only to limited assurance (marked L in ISSA 5000) or only to reasonable assurance (marked R) are shown or hidden automatically. For example:

  • Risks of material misstatement are identified and assessed at the disclosure level for limited assurance, and at the assertion level for the disclosures for reasonable assurance.
  • For limited assurance, the understanding of the system of internal control is obtained through inquiry. Where you plan to test controls, it also covers those controls and the related general IT controls.  For reasonable assurance, it is obtained through inquiry and other risk assessment procedures, and extends to control activities and general IT controls.
  • Risks of management override of controls are addressed for reasonable assurance.
  • The assurance report, conclusion wording and representation letter follow the level of assurance selected.

A combined engagement - where some disclosures receive limited assurance and others reasonable assurance - shows both sets of procedures and uses the combined assurance report.

New terminology

ISSA Sustainability uses the terminology of ISSA 5000. Key terms include:

  • Engagement leader - the partner or other individual appointed by the firm who is responsible for the engagement. It is the equivalent of 'engagement partner' in ISQM 1.
  • Applicable criteria - the criteria used for the engagement.
  • Criteria - the benchmarks used to measure or evaluate the sustainability matters. It comprises either framework criteria, entity-developed criteria, or both. Framework criteria are either fair presentation criteria or compliance criteria
  • Reporting boundary - activities, operations, relationships, or resources to be included in the entity sustainability information.
  • Sustainability competence - competence in the sustainability matters that are the subject of the sustainability assurance engagement and in their measurement or evaluation.
  • Sustainability information - information about sustainability matters.
  • Sustainability matters - environmental, social, governance, or other sustainability-related matters, as defined or described in law or regulation, or relevant sustainability reporting frameworks, or as determined by the entity for purposes of preparing or presenting sustainability information.
  • Component practitioner and another practitioner - a firm whose work you use. You can be sufficiently and appropriately involved in the work of a component practitioner, but not in the work of another practitioner.

An Engagement glossary is included in the file with the full list of terms and abbreviations.

 

From acceptance to reporting

Overview of the engagement file

The engagement file follows the life of a sustainability assurance engagement. The sections below walk through each stage and the documents you will use. A full document register, with the number, name and intent of every document, follows the stages.

Stage

Documents

Purpose

1. Acceptance and continuance

101, 111, 116, 117, 118

Capture engagement information, evaluate the engagement and agree the terms.

2. Understanding the entity

135.1, 141, 142

Understand the entity, the sustainability information and the entity's reporting process.

3. Planning, risk and materiality

125, 151, 152, 153, 165, 180, 182, 183

Determine materiality, assess risks, link risks to controls in the RACM and set the engagement strategy.

4. Using the work of others

216.1 - 216.5, 217.1 - 217.5, 218.1 - 218.5, 219.1

Evaluate other practitioners, experts and the internal audit function.

5. Gathering evidence

165 work programs, 215.1, 235.1, 245.1, 245.2, 265.1

Respond to assessed risks and obtain evidence.

6. Evaluating evidence and findings

9210, 9220, 9230, 9410

Subsequent events, other information, comparatives and misstatements.

7. Reporting and representations

9500, 9510.1 - 9510.3, 9610, 9700.1, 9700.2

Form the conclusion, issue the assurance report, communicate with TCWG and obtain written representations.

8. Review and sign-off

9810, 9840, 9850

Senior review, engagement quality review and engagement leader declaration.

Ethics and independence confirmations (111.1 - 111.5) are completed at planning and at finalisation. See section 3.

Stage 1 - Acceptance and continuance

101 Entity / firm information

101 tailors the file to the client. You capture the entity and practitioner information and make the selections that drive content in the engagement letter, representation letter and assurance report - including the reporting framework family, the extent of procedures, the independence standards and the jurisdiction add-on.

111 Engagement evaluation

111 records the acceptance or continuance decision. It helps you to:

  • Establish that the preconditions for the engagement are presentincluding whether the entity has a process to identify the sustainability information to be reported, appropriate sustainability matters, a rational purpose, suitable and available criteria, and, for limited assurance, the expectation of obtaining a meaningful level of assurance.
  • Confirm compliance with relevant ethical requirements, including independence, and that the team has the necessary sustainability competence.
  • Record the engagement-defining decisions - the level of assurance, the applicable criteria, the reporting boundary and the sustainability information in and out of scope.
  • Select the sustainability matters in scope. This selection is used in 125 Materiality and by the RACM (165), which generates a work program for each sustainability matter.

You are prompted if the preconditions are not present, so that you can discuss this with the engaging party before accepting the engagement.

116 - 118 Engagement letter

116 is a dynamic engagement letter that confirms the terms of the sustainability assurance engagement with management and, where applicable, those charged with governance. The wording adapts to your selections in 101 and 111. Use 117 for the firm's own terms and conditions and 118 to file the signed engagement letter.

Stage 2 - Understanding the entity

135.1 Discussions with TCWG, management, internal audit and key external experts

135.1 documents inquiries of, and discussions with, those charged with governance, management, the internal audit function and key external experts - including fraud and non-compliance inquiries. It is set up as a query, so you can send the inquiries to the client and record the responses in one place. Firm authors can tailor the query template in 135.

141 Gathering information

141 gathers what you need to plan the engagement: further information about the sustainability matters selected in 111, the reporting boundary, the entity's governance and reporting policies, and the applicable laws and regulations. It also captures the number of experts and other practitioners involved, which generates the forms needed in stage 4.

142 Entity's process to identify sustainability information to be reported

A new document that is unique to sustainability assurance. 142 evaluates whether the entity has a process to identify the information to be reported, and documents your understanding of that process - including the entity's own materiality process (impact and financial materiality, where the criteria require it) and how it determined the reporting boundary.

 

Stage 3 - Planning, risk assessment and materiality

125 Materiality and double materiality

125 is a dedicated materiality form for the sustainability matters selected in 111. Disclosures are reported in different units, such as tonnes of CO2e, or in percentages, headcount or narrative. Therefore, materiality is determined per quantitative disclosure, in the unit of that disclosure, together with performance materiality and the clearly trivial threshold. For qualitative disclosures, materiality is considered rather than determined as an amount. There is no single overall figure.

Double materiality. Where the applicable criteria require it (for example ESRS under the CSRD), the entity reports on both:

  • Financial materiality - sustainability matters that affect, or could affect, the entity's cash flows, performance, position or access to finance.
  • Impact materiality - the entity's actual and potential impacts on people and the environment.

125 provides materiality grids for both the financial and the impact perspective, for limited and for reasonable assurance. For quantitative disclosures, the lower of the financial and impact materiality is ordinarily used. For qualitative disclosures, the perspective that needs the greater level of detail is ordinarily used. Warnings flag any required rate or reason that has not been entered.

Double materiality flows through the rest of the file:

  • 142 documents how the entity's own materiality process addresses the impact perspective in addition to the financial perspective.
  • 9410 records each misstatement against its disclosure and perspective (financial or impact), and evaluates it against the materiality for that disclosure.
  • 9810 prompts you to reconsider materiality before evaluating uncorrected misstatements.

ISSA 5000 is framework-neutral. Whether double materiality applies depends on the applicable criteria, not on ISSA 5000 itself.

151 Inherent risk assessment

151 identifies fraud and inherent risk indicators for the sustainability information and assesses the risks of material misstatement - at the disclosure level for limited assurance, or at the assertion level for the disclosures for reasonable assurance.

152 Control and risk assessment

152 documents your understanding of the components of the entity's system of internal control relevant to sustainability matters and the preparation of the sustainability information, and records any control deficiencies identified. For reasonable assurance, it also evaluates the design and implementation of the controls identified in accordance with ISSA 5000. For limited assurance, design and implementation are evaluated only for the controls you plan to test for operating effectiveness, and the related general IT controls, using procedures in addition to inquiry.

153 Fraud and NOCLAR checklist

153 supports professional skepticism and alertness to fraud and non-compliance with laws and regulations (NOCLAR) throughout the engagement, and your response where fraud or non-compliance is identified or suspected.

182 Planning memorandum

182 summarises the engagement plan and strategy, the knowledge of the entity and the resources assigned. It also records the engagement team discussion required by ISSA 5000 and the outcome of the planning meeting. Use 180 to file the time budget.

183 Engagement quality review - planning

Where an engagement quality review is required, the reviewer completes 183 at the planning stage, in line with ISQM 2 and the firm's system of quality management. The review is completed in 9840.

 

165 Risk and control matrix - from risks to work programs

The risk and control matrix (RACM) is at the heart of the engagement file. It connects your risk assessment directly to the work you perform:

  • Sustainability matters - the sustainability matters in scope, selected in 111 (also used in 125 Materiality).
  • Risks - record the risks of material misstatement identified in 151 and 153, and assess each one.
  • Controls - record the controls identified in 152 that address those risks.
  • Matrix - link each risk to the controls that address it, so that you can see at a glance how each risk is addressed.
  • Work programs - the RACM generates a work program for each sustainability matter in scope, with the procedures that respond to the risks and controls linked to that matter.

Because the work programs are generated from the matrix, the procedures for each sustainability matter respond to the risks you assessed for it. If you change a risk or a control, the work program reflects the change. Where you plan to rely on controls, the tests of controls are documented in 245.1 and 245.2.

 

Stage 4 - Using the work of others

These planning checklists are generated from the counts entered in 141 - one per firm or expert, up to five each. They evaluate who you are relying on. The adequacy of their actual work is evaluated in the work program (215.1).

Document

Name

What it evaluates

216.1 - 216.5

Other practitioner - ethics, competence and objectivity checklist

Whether each firm is a component practitioner or another practitioner, and for another practitioner, its ethics, competence and the appropriateness of its scope.

217.1 - 217.5

Practitioner's expert - competence, capabilities and objectivity checklist

The competence, capabilities and objectivity of each internal or external expert you use.

218.1 - 218.5

Management's expert - competence, capabilities and objectivity checklist

The competence, capabilities and objectivity of each client's expert, and how management used their work.

219.1

Internal audit function - objectivity, competence and systematic approach checklist

The objectivity, competence and systematic and disciplined approach of the internal audit function.

 

Stage 5 - Gathering evidence

Your procedures for each sustainability matter come from the work program generated by the RACM (165). The documents below add the general requirements and the responses to specific areas.

215.1 General work program

215.1 evaluates the adequacy of the work of experts and the internal audit function used on the engagement, and sets out the general requirements for evidence, the design of further procedures, analytical procedures, sampling and agreement to records.

235.1 Estimates and forward-looking information checklist

Applies where the sustainability information includes estimates or forward-looking information - for example Scope 3 emissions, targets, transition plans, biodiversity metrics or scenario analysis. It helps you respond to the assessed risks, evaluate management bias and obtain the related written representation.

245.1 Tests of controls checklist and 245.2 Control testing register

Applies only where you plan to rely on the operating effectiveness of controls. 245.1 covers the design and performance of tests of controls, rotation and roll forward, deviations and, for reasonable assurance, the response to the risk of management override. Use 245.2 to record the controls tested.

265.1 Group sustainability information and aggregation checklist

Applies to group engagements, where the sustainability information is aggregated from more than one entity or component. It determines the components in scope and the resources required, and addresses risks arising from the aggregation process.

 

Stage 6 - Evaluating evidence and findings

Document

Name

Purpose

9210

Subsequent events

Identify events up to the date of the assurance report that may affect the sustainability information or the report and respond to facts that become known after that date.

9220

Other information checklist

Read the other information (for example the integrated or annual report) for material inconsistencies, and prepare the Other Information section of the report.

9230

Comparative information checklist

Applies where comparatives are required. Evaluate consistency with the prior period and determine the report treatment.

9410

Schedule of corrected and uncorrected misstatements checklist

Accumulate misstatements per disclosure, request correction and evaluate the effect of uncorrected misstatements.

 

 

Stage 7 - Reporting and representations

9500 Assurance report checklist and reports

9500 helps you form the conclusion and prepare the report in line with ISSA 5000. It works together with three dynamic report templates, based on the illustrative reports in ISSA 5000:

  • 9510.1 Reasonable assurance report
  • 9510.2 Limited assurance report
  • 9510.3 Combined assurance report

The reports follow the ISSA 5000 structure, with the conclusion first. The checklist prompts you on conclusion wording (fair presentation or compliance criteria), modifications, Emphasis of Matter and Other Matter paragraphs, the Other Information section and the treatment of comparatives.

9610 Report to management and those charged with governance

9610 communicates the matters arising from the engagement, including significant findings, non-compliance, control deficiencies, misstatements, other information findings, the written representations requested and independence.

9700.1 Written representations and 9700.2 Letter of representation

9700.1 helps you obtain and evaluate the written representations required by ISSA 5000, and records the independence and scope representations and a confirmations register. 9700.2 is the letter of representation, which adapts to the level of assurance.

 

Stage 8 - Review and sign-off

Document

Name

Purpose

9810

Senior checklist

Manager or senior completion review of documentation, evidence, misstatements, materiality, subsequent events, the conclusion and file assembly.

9840

Engagement quality review - Performing and completion

Completed by the engagement quality reviewer to evaluate the significant judgements and conclusions, in line with ISQM 2.

9850

Engagement leader declaration

The engagement leader takes overall responsibility for quality and confirms that the firm has a reasonable basis for the conclusion and the report may be issued.

 

Document register

The table below lists every document in the engagement file, in the order of the file. Documents marked (conditional) only appear when your selections require them.

Document

Name

Intent

Engagement setup

101

Entity / firm information

Tailor the file to the client. Selections drive content throughout the file, letters and reports.

Client acceptance and continuance

111

Engagement evaluation

Document the acceptance or continuance decision, the preconditions and the engagement-defining decisions.

111.1

Ethics and independence confirmation - Engagement team

Evidence that the engagement team complies with the relevant ethical requirements, including independence, with sign-offs at planning and finalisation and a record of matters identified.

111.2, 111.2.1

Ethics, independence and objectivity confirmation - Practitioner's external expert (conditional)

Obtain the external expert's confirmation through a query sent to the expert.

111.3

Ethics and independence confirmation - Engagement quality reviewer (conditional)

Evidence that the engagement quality reviewer, and anyone assisting them, is eligible and independent.

111.4, 111.4.1

Ethics and independence confirmation - Internal expert (conditional)

Obtain the internal expert's confirmation through a query.

111.5, 111.5.1

Ethics and independence confirmation - Other practitioner (conditional)

Obtain confirmation from another firm whose work you use, but in which you cannot be sufficiently and appropriately involved.

116

Engagement letter

Agree the terms of the sustainability assurance engagement.

117

Firm's terms and conditions

Placeholder for the firm's own terms and conditions.

118

Engagement letter (Signed)

Placeholder for the signed engagement letter.

Risk assessment and response

125

Materiality

Consider or determine materiality per disclosure, taking into account the financial and impact perspectives where the criteria require both, with performance materiality and the clearly trivial threshold for quantitative disclosures, for limited and reasonable assurance.

135.1

Discussions with those charged with governance, management, internal audit and key external experts

Send inquiries to, and record discussions with, TCWG, management, internal audit and key external experts.

141

Gathering information

Gather the information needed to plan the engagement and perform risk assessment procedures.

142

Entity's process to identify sustainability information to be reported

Evaluate the entity's process to identify the information to be reported, including its materiality process and reporting boundary.

151

Inherent risk assessment

Identify and assess the risks of material misstatement, whether due to fraud or error.

152

Control and risk assessment

Understand the system of internal control and evaluate the design and implementation of controls.

153

Fraud and NOCLAR checklist

Remain alert to fraud and non-compliance, and respond where it is identified or suspected.

165

Risk and control matrix

Record risks and controls, link them, and generate a work program for each sustainability matter.

Overall strategy

180

Time budget placeholder

Placeholder for the engagement time budget.

182

Planning memorandum

Summarise the engagement plan, strategy, resources and the engagement team discussion.

183

Engagement quality review - Planning (conditional)

Engagement quality reviewer's planning work, in line with ISQM 2.

Work of others

215.1

General work program

Evaluate the work of experts and internal audit used, and the general evidence requirements.

216.1 - 216.5

Other practitioner - ethics, competence and objectivity checklist (conditional)

Evaluate each firm whose work you use - one checklist per firm.

217.1 - 217.5

Practitioner's expert - competence, capabilities and objectivity checklist (conditional)

Evaluate each practitioner's expert - one checklist per expert.

218.1 - 218.5

Management's expert - competence, capabilities and objectivity checklist (conditional)

Evaluate each management's expert - one checklist per expert.

219.1

Internal audit function - objectivity, competence and systematic approach checklist (conditional)

Evaluate the internal audit function whose work you plan to use.

Evidence

235.1

Estimates and forward-looking information checklist (conditional)

Respond to risks in estimates and forward-looking information and evaluate management bias.

245.1

Tests of controls checklist (conditional)

Test the operating effectiveness of controls you plan to rely on.

245.2

Control testing register (conditional)

Record the controls tested.

265.1

Group sustainability information and aggregation checklist (conditional)

Address group engagements and the risks arising from aggregation.

Evaluate evidence and findings

9210

Subsequent events

Identify and evaluate events up to the date of the assurance report, and respond to facts that become known after that date.

9220

Other information checklist

Read the other information and prepare the Other Information section of the report.

9230

Comparative information checklist (conditional)

Evaluate comparative information and determine the report treatment.

9410

Schedule of corrected and uncorrected misstatements checklist

Accumulate and evaluate misstatements per disclosure.

Reporting

9500

Independent practitioner's sustainability assurance report checklist

Form the conclusion and prepare the assurance report in line with ISSA 5000.

9510.1

Reasonable assurance report

Assurance report for reasonable assurance engagements.

9510.2

Limited assurance report

Assurance report for limited assurance engagements.

9510.3

Combined assurance report

Assurance report for combined engagements.

Communication and representations

9610

Report to management and those charged with governance

Communicate the matters arising from the engagement.

9700.1

Written representations - independence and scope representations, confirmations register

Obtain and evaluate the written representations required by ISSA 5000.

9700.2

Letter of representation

Letter of representation, tailored to the level of assurance.

Final deliverables

9810

Senior checklist

Completion review of the engagement file by the manager or senior.

9840

Engagement quality review - Performing and completion (conditional)

Engagement quality reviewer's evaluation of the significant judgements and conclusions.

9850

Engagement leader declaration

Engagement leader's declaration that the report may be issued.

Engagement wrap-up

999

Written representation on matters relevant to the engagement

Placeholder for the signed written representations.

 

Ethics and independence

Which provisions apply

ISSA Sustainability applies the International Ethics Standards for Sustainability Assurance (IESSA) in the IESBA Code. The independence standards that apply are selected in 101, and the confirmations, letters and procedures show the matching wording and references:

  • Ethics: Sections 5100 to 5390 of Part 5 apply to every sustainability assurance engagement.
  • Independence: Part 5 applies where the engagement is within its scope. Part 4B applies otherwise.
  • Public interest entities: key sustainability assurance leaders also confirm their time on the engagement (R5540.7). All engagements: key sustainability assurance leaders confirm that they are not evaluated or compensated for selling non-assurance services to the client (R5411.4).
  • Value chain components: the provisions in Sections 5405 and 5406 that apply to assurance work at value chain components are effective for periods beginning on or after 1 July 2028 (IESSA effective date). Until then, the conceptual framework in Section 5120 applies to that work, and the firm publicly discloses that these provisions have not been applied. The engagement letter explains the deferral, and the 9510 reports include the disclosure.

Procedures use paragraph-level references to the Code. Requirements are addressed through procedures and application material through guidance, with core and extended procedures clearly identified.

Ethics and independence confirmations

Each confirmation includes a sign-off at planning, a sign-off at finalisation and a record of matters identified and their evaluation. Confirmations for experts and other practitioners are sent as queries, so they can be completed and signed outside the firm.

Document

Confirmation for

How it works

111.1

Engagement team

Completed by every engagement team member, including the engagement leader, and others who can directly influence the outcome of the engagement. Members who join during the engagement record their joined date, so that their confirmation is in place before they perform work.

111.2

Practitioner's external expert

Sent as one query (111.2.1) to the lead expert. Each expert team member who works on the engagement is added as a signer.

111.3

Engagement quality reviewer

Shown when an engagement quality review is required. Confirms the eligibility, objectivity and independence of the reviewer and anyone assisting them, including cooling-off and long association (ISQM 2.18 to 2.23, IESSA Section 5325 and, for public interest entities, R5540.7(b)).

111.4

Internal expert

Completed through a query (111.4.1) by the firm's internal expert.

111.5

Other practitioner

Sent as one query (111.5.1) to the other firm's engagement leader or partner, who signs for their firm. Used where you cannot be sufficiently and appropriately involved in the other firm's assurance work (R5406.5).

Firm authors can tailor the query templates (111.2Q, 111.4Q and 111.5Q).

Declaring and resolving matters

Team members and experts can declare an independence or objectivity matter. The engagement leader documents an evaluation of each matter - the type and level of threat, safeguards applied, the conclusion, and the reviewer and date. Matters raised at planning carry forward to finalisation, and the finalisation sign-off cannot be completed until all matters are resolved.

Ethics and independence across the engagement file

Ethics and independence are also built into the other documents in the file:

Document

Name

Ethics and independence content

101

Entity / firm information

Ethics and independence, scope of the independence standards (Part 5 or Part 4B) and firm-level independence.

111

Engagement evaluation

Ethical requirements including independence, documentation of independence and breaches, and the ethics, competence and objectivity of experts and other practitioners.

116

Engagement letter

The ethics and independence framework, the period during which independence is required, related entities, public interest entity disclosure and the deferred value chain provisions.

183

Engagement quality review - Planning

Planned approach and the reviewer's objectivity.

216.1 - 216.5

Other practitioner checklists

Ethics, competence and objectivity of another practitioner, and Section 5406 communication and independence (effective 15 December 2026; the value chain provisions from 1 July 2028).

217.1 - 217.5

Practitioner's expert checklists

Competence, capabilities and objectivity, and threats to the external expert's objectivity.

218.1 - 218.5, 219.1

Management's expert and internal audit checklists

Competence, capabilities and objectivity of management's experts and the internal audit function.

9700.1

Written representations

Representations supporting the independence and scope determinations.

9810

Senior checklist

Review of the ethics documentation on file.

9850

Engagement leader declaration

The engagement leader's declaration, including departures and objectives not achieved.

 

South Africa add-on

Local content for South African engagements

Select South Africa as the local jurisdiction add-on in 101 to include South African content, such as:

  • The IRBA Code of Professional Conduct for Registered Auditors, Part 5, as the applicable ethics and independence framework.
  • Assurance report signing requirements - the individual sustainability assurance practitioner responsible for the engagement signs the report, and the power to sign is not delegatedto anyone who is not a partner or fellow director, except in emergencies with the IRBA's written consent, and the signature shows the practitioner's full name, capacity and the designation 'Registered Auditor' (R5115.5 SA to R5115.8 SA).
  • Reportable irregularities under Section 45 of the Auditing Profession Act, where applicable.
  • Considerations for JSE-listed entities and the social and ethics committee.

 

Learn more

Launch webinar

Join us for an introduction to ISSA Sustainability and see how it supports firms performing sustainability assurance engagements aligned to ISSA 5000.

  • Date: 17 November 2026
  • Time: 11:00 - 12:00 SAST
  • Platform: Microsoft Teams

Book your seat and find more information on the ISSA Sustainability product page at www.casewareafrica.com/products/issa-sustainability.

 

 
Rate this article: 
  (Popularity = 0/100, Rating = 0.0/5)

   Related Articles

ISSA Sustainability | Generate work programs from the risk and control matrix ISSA Sustainability | Define materiality, including double materiality ISSA Sustainability | Send ethics and independence confirmations ISSA Sustainability | Prepare the assurance report view all...


   Search Results

Sending a Future Dated Request Can I request for a future "As of Date"? What does the Future Dated Confirmation Report provide? (New Version of Confirmation) Caseware Time | How can I find the client contacts that are missing after sending a client batch email? What if the Account ID requested was closed for the As of Date (New Version of Confirmation) view all...



Didn't find what you were looking for?


Watch a video

Check out our helpful video guides

Contact Support

Contact our support team
Copyright © 2026 | All Rights Reserved