Confirmation.com - ISSA Sustainability | Generate work programs from the risk and control matrix
FAQ

ISSA Sustainability | Generate work programs from the risk and control matrix

Published:  12/11/2026

The risk and control matrix (RACM) connects your risk assessment directly to the work you perform. It records the risks and controls, links them, and generates a work program for each sustainability matter in scope.


  Answer:

Use the risk and control matrix 

Before you start 

  • Select the sustainability matters in scope in 111 Engagement evaluation. 

  • Identify and assess risks in 151 Inherent risk assessment and 153 Fraud and NOCLAR checklist. 

  • Identify controls in 152 Control and risk assessment. 

To generate the work programs: 

  1. From the top menu, select Documents.

  2. Open 165 Risk and control matrix.

  3. In the Risks section, record the risks of material misstatement for each sustainability matter and assess each risk.

  4. In the Controls section, record the controls that address those risks.

  5. In the matrix, link each risk to the controls that address it. 

  1. In the performing, select which procedures would need to be performed for the sustainability matter and select () to generate or update the work program.
  2. The RACM generates a work program for each sustainability matter, in the Work programs folder on the document manager.
  3. The RACM generates a work program for each sustainability matter, with the procedures that respond to the linked risks and controls. 

  1. Perform and sign off the procedures in each work program. 

If you change a risk or a control, the work program reflects the change. If you change the procedure groups for a work program, it can be updated in by regenerating the work program.

Where you plan to rely on controls, document the tests of controls in 245.1 Test of controls checklist and 245.2 Control testing register

 
Rate this article: 
  (Popularity = 2/100, Rating = 0.0/5)

   Related Articles

ISSA Sustainability | Define materiality, including double materiality ISSA Sustainability | Send ethics and independence confirmations ISSA Sustainability | Overview ISSA Sustainability | Prepare the assurance report view all...


   Search Results

Sending a Future Dated Request Can I request for a future "As of Date"? What does the Future Dated Confirmation Report provide? (New Version of Confirmation) Caseware Time | How can I find the client contacts that are missing after sending a client batch email? What if the Account ID requested was closed for the As of Date (New Version of Confirmation) view all...



Didn't find what you were looking for?


Watch a video

Check out our helpful video guides

Contact Support

Contact our support team
Copyright © 2026 | All Rights Reserved