The risk and control matrix (RACM) connects your risk assessment directly to the work you perform. It records the risks and controls, links them, and generates a work program for each sustainability matter in scope.
Answer:
Use the risk and control matrix
Before you start
To generate the work programs:
-
From the top menu, select Documents.
-
Open 165 Risk and control matrix.
-
In the Risks section, record the risks of material misstatement for each sustainability matter and assess each risk.
-
In the Controls section, record the controls that address those risks.
-
In the matrix, link each risk to the controls that address it.
-
Perform and sign off the procedures in each work program.
If you change a risk or a control, the work program reflects the change. If you change the procedure groups for a work program, it can be updated in by regenerating the work program.
Where you plan to rely on controls, document the tests of controls in 245.1 Test of controls checklist and 245.2 Control testing register
Rate this article:
|vote=None|
Processing...
(Popularity = 2/100, Rating = 0.0/5)
Related Articles
ISSA Sustainability | Define materiality, including double materiality
ISSA Sustainability | Send ethics and independence confirmations
ISSA Sustainability | Overview
ISSA Sustainability | Prepare the assurance report
view all...
Search Results
Changing Client Signers on Forms
How do I know the client signer has authorized the auditor to send requests? (New Version of Confirmation)
Adding Financial Forms to a Client Profile
I can’t request authorisation from a client signer as the name is greyed out (cannot be selected)?
Can I add different authorised signers to different forms?
view all...